The Challenge
A customer in the Marcellus Formation in Pennsylvania, one of the nation’s largest midstream energy companies needed a cost-effective solution to add several 30-inch branch connections on an existing 30-inch pipeline to tie into a compressor station.
The Solution
WeldFit recommended eliminating the need for a sacrificial buried valve by utilizing a 3-way tee with a temporary hot tap valve on this project, which reduced the customer’s project execution costs. The 30-inch temporary hot tap valve was removed at the end of the project.
In addition, using the 3-way tee allowed the customer to run piping above ground instead of burying it, as other hot tapping configurations require.